Mode Pengenalan
Architecture and Design
Implementation
Requirements
Platform yang Berlaku
Bahasa
Nama: C (Undetermined)
Nama: C++ (Undetermined)
Nama: Verilog (Undetermined)
Kelas: Hardware Description Language (Undetermined)
Kelas: Not Language-Specific (Undetermined)
Arsitektur
Nama: ARM (Undetermined)
Nama: x86 (Undetermined)
Kelas: Embedded (Undetermined)
Teknologi
Nama: Security Hardware (Undetermined)
Nama: Processor Hardware (Undetermined)
Nama: Microcontroller Hardware (Undetermined)
Kelas: System on Chip (Undetermined)
Konsekuensi Umum
| Cakupan |
Dampak |
Kemungkinan |
| Confidentiality | Read Memory, Read Files or Directories | Medium |
| Integrity | Modify Memory, Modify Files or Directories | Medium |
| Availability | DoS: Resource Consumption (Memory), DoS: Crash, Exit, or Restart | High |
Contoh yang Diamati
| Referensi |
Deskripsi |
| Open source silicon root of trust (RoT) product does not immediately report when an integrity check fails for memory requests, causing the product to accept and continue processing data [REF-1468] |
Mitigasi yang Memungkinkan
Phases : Architecture and Design
Phases : Implementation
Metode Deteksi
Automated Static Analysis - Source Code
Efektivitas : High
Manual Static Analysis - Source Code
Efektivitas : Moderate
Catatan Pemetaan Kerentanan
Justifikasi : This CWE entry is at the Base level of abstraction, which is a preferred level of abstraction for mapping to the root causes of vulnerabilities.
Komentar : Carefully read both the name and description to ensure that this mapping is an appropriate fit. Do not try to 'force' a mapping to a lower-level Base/Variant simply to comply with this preferred level of abstraction.
Referensi
REF-1468
OpenTitan issue: [rv_core_ibex] Bus errors on integrity check failure
GregAC.
https://github.com/lowRISC/opentitan/issues/11336
Pengajuan
| Nama |
Organisasi |
Tanggal |
Tanggal rilis |
Version |
| Amisha Srivastava |
University of Texas at Dallas |
2023-12-20 +00:00 |
2025-04-03 +00:00 |
4.17 |
Modifikasi
| Nama |
Organisasi |
Tanggal |
Komentar |
| CWE Content Team |
MITRE |
2025-12-11 +00:00 |
updated Demonstrative_Examples, Weakness_Ordinalities |
| CWE Content Team |
MITRE |
2026-10-28 +00:00 |
updated Demonstrative_Examples, Detection_Factors |