Detail CWE-666

CWE-666

Operation on Resource in Wrong Phase of Lifetime
2008-04-11
00h00 +00:00
Draft
2026-10-28
00h00 +00:00
Notifikasi untuk CWE tertentu
Tetap terinformasi tentang perubahan untuk CWE tertentu.
Kelola notifikasi

Nama: Operation on Resource in Wrong Phase of Lifetime

The product performs an operation on a resource at the wrong phase of the resource's lifecycle, which can lead to unexpected behaviors.

Informasi Umum

Mode Pengenalan

Implementation

Platform yang Berlaku

Bahasa

Kelas: Not Language-Specific (Undetermined)

Konsekuensi Umum

Cakupan Dampak Kemungkinan
OtherVaries by Context, Modify Application Data

Catatan: Using a resource before it has been fully initialized could cause corruption or incorrect data to be used.

Contoh yang Diamati

Referensi Deskripsi

CVE-2006-5051

Chain: Signal handler contains too much functionality (CWE-828), introducing a race condition (CWE-362) that leads to a double free (CWE-415).

Mitigasi yang Memungkinkan

Phases : Architecture and Design
Follow the resource's lifecycle from creation to release.
Phases : Implementation
For each phase, it is important to follow the specifications outlined for how to operate on the resource and to ensure that the resource is in the expected phase. Otherwise, if a resource is in one phase but the operation is not valid for that phase (i.e., an incorrect phase of the resource's lifetime), then this can produce resultant weaknesses.

Metode Deteksi

Automated Static Analysis

Automated static analysis, commonly referred to as Static Application Security Testing (SAST), can find some instances of this weakness by analyzing source code (or binary/compiled code) without having to execute it. Typically, this is done by building a model of data flow and control flow, then searching for potentially-vulnerable patterns that connect "sources" (origins of input) with "sinks" (destinations where the data interacts with external components, a lower layer such as the OS, etc.)

Catatan Pemetaan Kerentanan

Justifikasi : This CWE entry is a level-1 Class (i.e., a child of a Pillar). It might have lower-level children that would be more appropriate
Komentar : Examine children of this entry to see if there is a better fit

Catatan

A resource's lifecycle includes several phases: initialization, use, and release.

Pengajuan

Nama Organisasi Tanggal Tanggal rilis Version
CWE Content Team MITRE 2008-04-11 +00:00 2008-04-11 +00:00 Draft 9

Modifikasi

Nama Organisasi Tanggal Komentar
Eric Dalci Cigital 2008-07-01 +00:00 updated Potential_Mitigations, Time_of_Introduction
CWE Content Team MITRE 2008-09-08 +00:00 updated Description
CWE Content Team MITRE 2010-09-27 +00:00 updated Relationships
CWE Content Team MITRE 2011-03-29 +00:00 updated Relationships
CWE Content Team MITRE 2011-06-01 +00:00 updated Common_Consequences
CWE Content Team MITRE 2012-05-11 +00:00 updated Relationships
CWE Content Team MITRE 2012-10-30 +00:00 updated Potential_Mitigations
CWE Content Team MITRE 2014-07-30 +00:00 updated Relationships
CWE Content Team MITRE 2017-11-08 +00:00 updated Taxonomy_Mappings
CWE Content Team MITRE 2019-01-03 +00:00 updated Relationships
CWE Content Team MITRE 2019-06-20 +00:00 updated Type
CWE Content Team MITRE 2020-02-24 +00:00 updated Relationships, Time_of_Introduction
CWE Content Team MITRE 2023-01-31 +00:00 updated Description
CWE Content Team MITRE 2023-04-27 +00:00 updated Relationships
CWE Content Team MITRE 2023-06-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2023-10-26 +00:00 updated Demonstrative_Examples, Observed_Examples
CWE Content Team MITRE 2024-02-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2025-12-11 +00:00 updated Applicable_Platforms, Detection_Factors, Weakness_Ordinalities
CWE Content Team MITRE 2026-10-28 +00:00 updated Common_Consequences, Description, Potential_Mitigations, Theoretical_Notes