| 弱点名 | 出典 | |
|---|---|---|
| Uncontrolled Resource Consumption The product does not properly control the allocation and maintenance of a limited resource. |
||
| Improper Validation of Specified Quantity in Input The product receives input that is expected to specify a quantity (such as size or length), but it does not validate or incorrectly validates that the quantity has the required properties. |