CWE-666 詳細

CWE-666

Operation on Resource in Wrong Phase of Lifetime
2008-04-11
00h00 +00:00
Draft
2026-10-28
00h00 +00:00
特定のCWEの通知
特定のCWEの変更情報をいち早くお届けします。
通知を管理する

名前: Operation on Resource in Wrong Phase of Lifetime

The product performs an operation on a resource at the wrong phase of the resource's lifecycle, which can lead to unexpected behaviors.

一般情報

導入モード

Implementation

適用可能なプラットフォーム

言語

クラス: Not Language-Specific (Undetermined)

一般的な結果

スコープ 影響 可能性
OtherVaries by Context, Modify Application Data

注記:Using a resource before it has been fully initialized could cause corruption or incorrect data to be used.

観察された例

参考文献 説明

CVE-2006-5051

Chain: Signal handler contains too much functionality (CWE-828), introducing a race condition (CWE-362) that leads to a double free (CWE-415).

潜在的な緩和策

Phases : Architecture and Design
Follow the resource's lifecycle from creation to release.
Phases : Implementation
For each phase, it is important to follow the specifications outlined for how to operate on the resource and to ensure that the resource is in the expected phase. Otherwise, if a resource is in one phase but the operation is not valid for that phase (i.e., an incorrect phase of the resource's lifetime), then this can produce resultant weaknesses.

検出方法

Automated Static Analysis

Automated static analysis, commonly referred to as Static Application Security Testing (SAST), can find some instances of this weakness by analyzing source code (or binary/compiled code) without having to execute it. Typically, this is done by building a model of data flow and control flow, then searching for potentially-vulnerable patterns that connect "sources" (origins of input) with "sinks" (destinations where the data interacts with external components, a lower layer such as the OS, etc.)

脆弱性マッピングノート

理由 : This CWE entry is a level-1 Class (i.e., a child of a Pillar). It might have lower-level children that would be more appropriate
コメント : Examine children of this entry to see if there is a better fit

ノート

A resource's lifecycle includes several phases: initialization, use, and release.

登録情報

名前 組織 日付 リリース日 Version
CWE Content Team MITRE 2008-04-11 +00:00 2008-04-11 +00:00 Draft 9

変更履歴

名前 組織 日付 コメント
Eric Dalci Cigital 2008-07-01 +00:00 updated Potential_Mitigations, Time_of_Introduction
CWE Content Team MITRE 2008-09-08 +00:00 updated Description
CWE Content Team MITRE 2010-09-27 +00:00 updated Relationships
CWE Content Team MITRE 2011-03-29 +00:00 updated Relationships
CWE Content Team MITRE 2011-06-01 +00:00 updated Common_Consequences
CWE Content Team MITRE 2012-05-11 +00:00 updated Relationships
CWE Content Team MITRE 2012-10-30 +00:00 updated Potential_Mitigations
CWE Content Team MITRE 2014-07-30 +00:00 updated Relationships
CWE Content Team MITRE 2017-11-08 +00:00 updated Taxonomy_Mappings
CWE Content Team MITRE 2019-01-03 +00:00 updated Relationships
CWE Content Team MITRE 2019-06-20 +00:00 updated Type
CWE Content Team MITRE 2020-02-24 +00:00 updated Relationships, Time_of_Introduction
CWE Content Team MITRE 2023-01-31 +00:00 updated Description
CWE Content Team MITRE 2023-04-27 +00:00 updated Relationships
CWE Content Team MITRE 2023-06-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2023-10-26 +00:00 updated Demonstrative_Examples, Observed_Examples
CWE Content Team MITRE 2024-02-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2025-12-11 +00:00 updated Applicable_Platforms, Detection_Factors, Weakness_Ordinalities
CWE Content Team MITRE 2026-10-28 +00:00 updated Common_Consequences, Description, Potential_Mitigations, Theoretical_Notes