CWE-666 상세 정보

CWE-666

Operation on Resource in Wrong Phase of Lifetime
2008-04-11
00h00 +00:00
Draft
2026-10-28
00h00 +00:00
특정 CWE 알림
특정 CWE의 변경 사항에 대한 정보를 받아보세요.
알림 관리

이름: Operation on Resource in Wrong Phase of Lifetime

The product performs an operation on a resource at the wrong phase of the resource's lifecycle, which can lead to unexpected behaviors.

일반 정보

취약점 도입 방식

Implementation

적용 가능한 플랫폼

언어

클래스: Not Language-Specific (Undetermined)

일반적인 결과

범위 영향 가능성
OtherVaries by Context, Modify Application Data

참고: Using a resource before it has been fully initialized could cause corruption or incorrect data to be used.

관찰된 예시

참고 자료 설명

CVE-2006-5051

Chain: Signal handler contains too much functionality (CWE-828), introducing a race condition (CWE-362) that leads to a double free (CWE-415).

잠재적 완화 방법

Phases : Architecture and Design
Follow the resource's lifecycle from creation to release.
Phases : Implementation
For each phase, it is important to follow the specifications outlined for how to operate on the resource and to ensure that the resource is in the expected phase. Otherwise, if a resource is in one phase but the operation is not valid for that phase (i.e., an incorrect phase of the resource's lifetime), then this can produce resultant weaknesses.

탐지 방법

Automated Static Analysis

Automated static analysis, commonly referred to as Static Application Security Testing (SAST), can find some instances of this weakness by analyzing source code (or binary/compiled code) without having to execute it. Typically, this is done by building a model of data flow and control flow, then searching for potentially-vulnerable patterns that connect "sources" (origins of input) with "sinks" (destinations where the data interacts with external components, a lower layer such as the OS, etc.)

취약점 매핑 메모

근거 : This CWE entry is a level-1 Class (i.e., a child of a Pillar). It might have lower-level children that would be more appropriate
댓글 : Examine children of this entry to see if there is a better fit

메모

A resource's lifecycle includes several phases: initialization, use, and release.

제출

이름 조직 날짜 출시일 Version
CWE Content Team MITRE 2008-04-11 +00:00 2008-04-11 +00:00 Draft 9

수정 사항

이름 조직 날짜 댓글
Eric Dalci Cigital 2008-07-01 +00:00 updated Potential_Mitigations, Time_of_Introduction
CWE Content Team MITRE 2008-09-08 +00:00 updated Description
CWE Content Team MITRE 2010-09-27 +00:00 updated Relationships
CWE Content Team MITRE 2011-03-29 +00:00 updated Relationships
CWE Content Team MITRE 2011-06-01 +00:00 updated Common_Consequences
CWE Content Team MITRE 2012-05-11 +00:00 updated Relationships
CWE Content Team MITRE 2012-10-30 +00:00 updated Potential_Mitigations
CWE Content Team MITRE 2014-07-30 +00:00 updated Relationships
CWE Content Team MITRE 2017-11-08 +00:00 updated Taxonomy_Mappings
CWE Content Team MITRE 2019-01-03 +00:00 updated Relationships
CWE Content Team MITRE 2019-06-20 +00:00 updated Type
CWE Content Team MITRE 2020-02-24 +00:00 updated Relationships, Time_of_Introduction
CWE Content Team MITRE 2023-01-31 +00:00 updated Description
CWE Content Team MITRE 2023-04-27 +00:00 updated Relationships
CWE Content Team MITRE 2023-06-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2023-10-26 +00:00 updated Demonstrative_Examples, Observed_Examples
CWE Content Team MITRE 2024-02-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2025-12-11 +00:00 updated Applicable_Platforms, Detection_Factors, Weakness_Ordinalities
CWE Content Team MITRE 2026-10-28 +00:00 updated Common_Consequences, Description, Potential_Mitigations, Theoretical_Notes