Các cách xuất hiện
Implementation
Nền tảng áp dụng
Ngôn ngữ
Lớp: Not Language-Specific (Undetermined)
Hậu quả phổ biến
| Phạm vi |
Tác động |
Khả năng xảy ra |
| Other | Varies by Context, Modify Application Data
Ghi chú: Using a resource before it has been fully
initialized could cause corruption or incorrect data to
be used. | |
Ví dụ đã quan sát
| Tài liệu tham khảo |
Mô tả |
| Chain: Signal handler contains too much functionality (CWE-828), introducing a race condition (CWE-362) that leads to a double free (CWE-415). |
Các biện pháp giảm thiểu tiềm năng
Phases : Architecture and Design
Follow the resource's lifecycle from creation to release.
Phases : Implementation
For each phase, it is important to follow the specifications outlined for how to operate on the resource and to ensure that the resource is in the expected phase. Otherwise, if a resource is in one phase but the operation is not valid for that phase (i.e., an incorrect phase of the resource's lifetime), then this can produce resultant weaknesses.
Phương pháp phát hiện
Automated Static Analysis
Automated static analysis, commonly referred to as Static Application Security Testing (SAST), can find some instances of this weakness by analyzing source code (or binary/compiled code) without having to execute it. Typically, this is done by building a model of data flow and control flow, then searching for potentially-vulnerable patterns that connect "sources" (origins of input) with "sinks" (destinations where the data interacts with external components, a lower layer such as the OS, etc.)
Ghi chú ánh xạ lỗ hổng
Lý do : This CWE entry is a level-1 Class (i.e., a child of a Pillar). It might have lower-level children that would be more appropriate
Bình luận : Examine children of this entry to see if there is a better fit
Ghi chú
A resource's lifecycle includes several phases: initialization, use, and release.
Gửi
| Tên |
Tổ chức |
Ngày |
Ngày phát hành |
Version |
| CWE Content Team |
MITRE |
2008-04-11 +00:00 |
2008-04-11 +00:00 |
Draft 9 |
Sửa đổi
| Tên |
Tổ chức |
Ngày |
Bình luận |
| Eric Dalci |
Cigital |
2008-07-01 +00:00 |
updated Potential_Mitigations, Time_of_Introduction |
| CWE Content Team |
MITRE |
2008-09-08 +00:00 |
updated Description |
| CWE Content Team |
MITRE |
2010-09-27 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2011-03-29 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2011-06-01 +00:00 |
updated Common_Consequences |
| CWE Content Team |
MITRE |
2012-05-11 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2012-10-30 +00:00 |
updated Potential_Mitigations |
| CWE Content Team |
MITRE |
2014-07-30 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2017-11-08 +00:00 |
updated Taxonomy_Mappings |
| CWE Content Team |
MITRE |
2019-01-03 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2019-06-20 +00:00 |
updated Type |
| CWE Content Team |
MITRE |
2020-02-24 +00:00 |
updated Relationships, Time_of_Introduction |
| CWE Content Team |
MITRE |
2023-01-31 +00:00 |
updated Description |
| CWE Content Team |
MITRE |
2023-04-27 +00:00 |
updated Relationships |
| CWE Content Team |
MITRE |
2023-06-29 +00:00 |
updated Mapping_Notes |
| CWE Content Team |
MITRE |
2023-10-26 +00:00 |
updated Demonstrative_Examples, Observed_Examples |
| CWE Content Team |
MITRE |
2024-02-29 +00:00 |
updated Mapping_Notes |
| CWE Content Team |
MITRE |
2025-12-11 +00:00 |
updated Applicable_Platforms, Detection_Factors, Weakness_Ordinalities |
| CWE Content Team |
MITRE |
2026-10-28 +00:00 |
updated Common_Consequences, Description, Potential_Mitigations, Theoretical_Notes |