Detalle CWE-1276

CWE-1276

Hardware Child Block Incorrectly Connected to Parent System
Incomplete
2020-02-24
00h00 +00:00
2025-12-11
00h00 +00:00
Notificaciones para un CWE
Manténgase informado sobre cualquier cambio en un CWE específico.
Gestionar notificaciones

Nombre: Hardware Child Block Incorrectly Connected to Parent System

Signals between a hardware IP and the parent system design are incorrectly connected causing security risks.

Informaciones generales

Modos de introducción

Implementation : This weakness is introduced when integrating IP into a parent design.

Plataformas aplicables

Lenguaje

Class: Not Language-Specific (Undetermined)

Sistemas operativos

Class: Not OS-Specific (Undetermined)

Arquitecturas

Class: Not Architecture-Specific (Undetermined)

Tecnologías

Class: Not Technology-Specific (Undetermined)

Consecuencias comunes

Alcance Impacto Probabilidad
Confidentiality
Integrity
Availability
Varies by Context

Mitigaciones potenciales

Phases : Testing
System-level verification may be used to ensure that components are correctly connected and that design security requirements are not violated due to interactions between various IP blocks.

Notas de mapeo de vulnerabilidades

Justificación : This CWE entry is at the Base level of abstraction, which is a preferred level of abstraction for mapping to the root causes of vulnerabilities.
Comentario : Carefully read both the name and description to ensure that this mapping is an appropriate fit. Do not try to 'force' a mapping to a lower-level Base/Variant simply to comply with this preferred level of abstraction.

Referencias

REF-1362

ariane.sv
https://github.com/HACK-EVENT/hackatdac21/blob/b9ecdf6068445d76d6bee692d163fededf7a9d9b/piton/design/chip/tile/ariane/src/ariane.sv#L539:L540

REF-1363

Fix CWE-1276
https://github.com/HACK-EVENT/hackatdac21/blob/9a796ee83e21f59476d4b0a68ec3d8e8d5148214/piton/design/chip/tile/ariane/src/ariane.sv#L539:L540

Envío

Nombre Organización Fecha Fecha de lanzamiento Version
Nicole Fern Cycuity (originally submitted as Tortuga Logic) 2020-05-22 +00:00 2020-02-24 +00:00 4.1

Modificaciones

Nombre Organización Fecha Comentario
CWE Content Team MITRE 2020-08-20 +00:00 updated Demonstrative_Examples, Description, Modes_of_Introduction, Name, Potential_Mitigations
CWE Content Team MITRE 2022-10-13 +00:00 updated Demonstrative_Examples
CWE Content Team MITRE 2023-04-27 +00:00 updated Relationships
CWE Content Team MITRE 2023-06-29 +00:00 updated Mapping_Notes
CWE Content Team MITRE 2023-10-26 +00:00 updated Demonstrative_Examples, References
CWE Content Team MITRE 2025-12-11 +00:00 updated Demonstrative_Examples, Weakness_Ordinalities